Engineering evaluation of potable water and wastewater systems to handle proposed assisted living facility expansion and the re-design and construction phase services of those systems. Prior work included design and construction phase service for the original on-site public community water supply system and advanced wastewater treatment and disposal system for the 60-unit assisted living and independent living facilities in Townshend, VT. Prepared VT DEC Wastewater Management Division and Water Supply Division permit applications, inspection reports, as-built drawings and a water system Operation & Maintenance Manual.
© Copyright 2016. Marquise & Morano, LLC. 35 Westminister Rd, Bellows Falls, VT 05101 ph: 802-463-3934 All rights reserved.