Projects >


Timber Creek Condominiums

Timber Creek Condominiums | West Dover, VT | 2012

An existing Public Community water system serving 212 residential condominiums and a club house experienced low pressure problems in portions of the system. We prepared a hydraulic model (EPANET) to simulate a proposed high pressure zone created by a proposed booster pump station and isolation valves. Our preliminary engineering report discussed the model findings, fire flow, alternative energy, proposed water main and pump station layout, design criteria for the booster pump station and cost estimates. Final water main and booster pump station design approved and permitted by VT Water Supply Division and construction phase engineering services.

Service Components